Place of Origin: | Jiangsu, China |
---|---|
Brand Name: | Yushun |
Certification: | ISO 9001 |
Model Number: | Customized |
Minimum Order Quantity: | 1 set |
Price: | Negotiated |
Packaging Details: | normal package naked or pack it according to customers' request |
Delivery Time: | 30 days |
Payment Terms: | L/C, T/T |
Supply Ability: | Negotiated |
Name: | Electric Arc Furnace Steel Smelting | Specification: | Customized |
---|---|---|---|
Condition: | New | Apply: | Manufacturing Plant |
Usage: | Melting Furnace | Power Type: | AC Arc Furnace |
Melting Material: | Ferrous | Weight: | Customized |
High Light: | AC Steelmaking Electric Arc Furnace,ISO9001 Steelmaking Electric Arc Furnace,AC electric furnace steelmaking |
Electric Arc Furnace Steel Smelting
1. Electric arc furnace is used to scrap melting, taking of the C/P/S/O, and molten steel heating, etc. It is applied to melting steel of different grades and components.
2. It can be put off the material of iron mix C, iron alloy, DRI and HBI when it is working.
3. Additional charging during the melting process and primary alloying process.
Specification for 25 ton EAF | |||
Engine | Engine power | Kw/rpm | 1300/2150 |
Power type | AC/DC | AC | |
Furnace capacity(tons) | T | 10-220t | |
Transformer | Main capacity transformer | Km/h | 10 |
Peak current of electrode (max.) | KA | ≤20 | |
Range of rectified voltage | V | 0-800 | |
Other system | PLC system | ||
Power supply | |||
Dust removal equipment |
Function
1. Used for scrap melting, decarbonization, dephosphorization, desulfuration, deoxygenation and molten steel heating, etc. For melting steel of different grades and components.
2. Partial hot metal charging or charging pig iron, sponge iron(DRI) and hot briquetted iron(HBI).
3. Additional charging during the melting process and primary alloying process.
Main Features
1. Refractory material saving due to the water cooled roof and water cooled panels.
2. Slag less tapping and tapping temperature reducing result from EBT.
3. Impendence of large current reducing due to the copper and steel composite conductive arm and large section water cooled cable.
4. Power consumption for per ton of steel and smelting period are reduced due to adopting furnace door C-O lance and furnace wall coherent oxygen lance.
5. Fume collection rate is increasing due to adopting furnace roof fourth hole and other fume discharging methods.
6. Scrap steel continuous charging and preheating system could applied thus saving energy, reduce consumption and improve smelting efficiency.
7. Raw material(DRI/HBI), lime and alloy automatic charging system could be equipped.
8. Equipped with advance PLC control system and smelting model.
Selling Units: Single item
Single package size: 150*100*170cm
Single gross weight: 100,000kg
Package Type: Safety Seaworthy Package
Lead Time:
Quantity (Tons) | 1-100 | >100 |
Est. Time(Days) | 60 | To be negotiated |