Place of Origin: | Jiangsu, China |
---|---|
Brand Name: | Yushun |
Certification: | ISO 9001 |
Model Number: | Customized |
Minimum Order Quantity: | 1 set |
Price: | Negotiated |
Packaging Details: | normal package naked or pack it according to customers' request |
Delivery Time: | 30 days |
Payment Terms: | L/C, T/T |
Supply Ability: | Negotiated |
Name: | VOD Ladle Refining Furnace 50ton | Dimension: | All Size, Customized |
---|---|---|---|
Application: | Melting Metal | Power: | 1000KW |
Voltage: | Depending On Production | Material: | Gold Silver Copper Aluminum Lead |
Frequency: | 100-200khz | Condition: | New |
High Light: | VOD LRF Steel Making,1000KW LRF Steel Making,50 ton VOD furnace |
VOD Ladle Refining Furnace 50ton
Function:
1. Arc heating at normal pressure, temperature measurement ans sampling, and final temperature precise control can optimize the pouring temperature.
2. Refining, desulfurization, deoxidation, degassing and inclusion removal of synthetic slag.
3. Bottom blowing argon stirring makes the temperature of molten steel uniform, the composition uniform and pure.
4. Alloy fine-tuning makes the composition control accurate, and the final required chemical composition can be efficiently achieved by ferroalloy elements or or aluminum or wire feeding.
5. With wire feeding machine, desulfurization and deoxidation of molten steel can be achieved, morphological distribution of inclusions can be changed, and alloy elements can be accurately controlled. At the same time, the alloy yield is high, the temperature of molten steel is low, and the environmental pollution is small.
6. As the buffer equipment between primary smelting furnace and continuous castingmachine, it ensures the matching production of primary smelting furnace and continuous casting, and realizes multi-furnace continuous casting.
LF Performance
Item | Unit | Parameters |
Rated refining capacity | T | 10-12 |
Rated transformer power | KVA | 2000 |
Tap to tap time | min | 45 |
Molten steel heating rate | min | ≧3 |
Power consumption | ℃/min | ≦0.6-0.7 |
Electrode consumption | KWh/t*℃ | ≦12-15g |
Component Parameters
Transformer | |||
Rated Power | KVA | 2000 | Overload 20% |
Primary Voltage | KV | 20 | |
Secondary Voltage | V | 160-100 | 5 speed |
Ladle | |||
Max diameter of ladle | mm | Φ1920 | |
Spare height | mm | 500 | |
Large current system | |||
Impedance unbalance | % | ≦4 | |
Theoretical value resistance | |||
Electrode system | |||
Electrode diameter | mm | Φ200 | Graphite diameter |
Electrode distribution | mm | Φ460 | |
Lifting speed | M/min | Up/down:4/3 | |
Electrode lifting height | mm | 1600 | |
Ladle car | |||
Weight of load | T | 50 | |
Drive mode | motor | Frequency control | |
Speed | m | 2-16 | |
Water cooling system | |||
Flow rate | M3/h | 80 | |
Inlet pressure | Mpa | 0.4-0.6 | |
Hydraulic station | |||
Rated pressure | 17.5 |
Characteristic:
1. The water-cooled furnace cover is equipped with a dust removal interface which can adjust the size of the delayed outlet, so that the furnace can always operate in a micro-positive pressure reducing atmosphere.
2. The copper-steel composition conductive cross arm is used to reduce the diameter of the electrode distribution circle and improve the service life of the furnace lining.
3. It is equipped with automatic or manual temperature measuring and sampling device to accurately measure molten steel temperature.
4. Large cross-section water-cooled cable, compensator and copper-steel composite conductive cross-arm are used in large current system to reduce the main circuit impedance.
5. The automatic feeding device of alloy and slag is used to accurately measure the alloy and slag added into the package.
6. It is equipped with PLC control system and smelting model.
Application
Ladle refining furnace belongs to the secondary refining equipment, which typically to be used
follows the primary melting furnace. Its main function is to remove sulfur, impurity from molten steel
and adjust chemical components, thereby, improve quality of molten steel. LF is mainly used in
high-quality carbon steel, stainless steel, manganess steel and other metal smelting.
Selling Units: Single item
Single package size: 150*100*170cm
Single gross weight: 100,000kg
Package Type: Safety Seaworthy Package
Lead Time:
Quantity (Tons) | 1-100 | >100 |
Est. Time(Days) | 60 | To be negotiated |